{"id":1444,"date":"2017-07-31T11:50:59","date_gmt":"2017-07-31T11:50:59","guid":{"rendered":"http:\/\/romelcoinc.com\/?post_type=blog_post&#038;p=1444"},"modified":"2024-09-19T10:30:19","modified_gmt":"2024-09-19T02:30:19","slug":"the-sep-of-romelco-is-grinding-once-again","status":"publish","type":"blog_post","link":"https:\/\/romelcoinc.com\/index.php\/blog-post\/the-sep-of-romelco-is-grinding-once-again\/","title":{"rendered":"<b>The SEP of ROMELCO is grinding once again<\/b>"},"content":{"rendered":"<p><span style=\"color: #000000;\">July 31, 2017<\/span><\/p>\n<p>&nbsp;<\/p>\n<p><span style=\"color: #000000;\">Sa aming mga minamahal na Miyembro Konsumedores:<\/span><\/p>\n<p>&nbsp;<\/p>\n<p><span style=\"color: #000000;\"><strong>PAKSA: The Sitio Electrification Program (SEP) of\u00a0ROMELCO\u00a0is grinding once again<\/strong><\/span><\/p>\n<p>&nbsp;<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-1447\" src=\"https:\/\/romelcoinc.com\/wp-content\/uploads\/2017\/07\/20597214_1864220980562813_6367488524424516934_n.jpg\" alt=\"20597214_1864220980562813_6367488524424516934_n\" width=\"539\" height=\"960\" srcset=\"https:\/\/romelcoinc.com\/wp-content\/uploads\/2017\/07\/20597214_1864220980562813_6367488524424516934_n.jpg 539w, https:\/\/romelcoinc.com\/wp-content\/uploads\/2017\/07\/20597214_1864220980562813_6367488524424516934_n-168x300.jpg 168w, https:\/\/romelcoinc.com\/wp-content\/uploads\/2017\/07\/20597214_1864220980562813_6367488524424516934_n-300x534.jpg 300w\" sizes=\"auto, (max-width: 539px) 100vw, 539px\" \/><\/p>\n<p>&nbsp;<\/p>\n<p><span style=\"color: #000000;\">The Sitio Electrification Program (SEP) of ROMELCO is grinding once again. Top in the coop&#8217;s list is the Sitio Balao in Barangay Lonos Romblon that happened to be delayed from its previous date of commencement because of the problem in the right of way. Just recently the concerned owners of the properties permitted the passing of distribution lines in their place. A massive right of way clearing was conducted in the said Sitio last July 20, 2017 as well as the training of their future meter reader collector in the area. A minimum of 50 household is waiting for the said project to be energize before the end of September 2017.<\/span><\/p>\n<p>&nbsp;<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-1446\" src=\"https:\/\/romelcoinc.com\/wp-content\/uploads\/2017\/07\/20525894_1864221027229475_8248450161703819845_n.jpg\" alt=\"20525894_1864221027229475_8248450161703819845_n\" width=\"539\" height=\"960\" srcset=\"https:\/\/romelcoinc.com\/wp-content\/uploads\/2017\/07\/20525894_1864221027229475_8248450161703819845_n.jpg 539w, https:\/\/romelcoinc.com\/wp-content\/uploads\/2017\/07\/20525894_1864221027229475_8248450161703819845_n-168x300.jpg 168w, https:\/\/romelcoinc.com\/wp-content\/uploads\/2017\/07\/20525894_1864221027229475_8248450161703819845_n-300x534.jpg 300w\" sizes=\"auto, (max-width: 539px) 100vw, 539px\" \/> <img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-1445\" src=\"https:\/\/romelcoinc.com\/wp-content\/uploads\/2017\/07\/20479430_1864221263896118_8580434875261918543_n.jpg\" alt=\"20479430_1864221263896118_8580434875261918543_n\" width=\"539\" height=\"960\" srcset=\"https:\/\/romelcoinc.com\/wp-content\/uploads\/2017\/07\/20479430_1864221263896118_8580434875261918543_n.jpg 539w, https:\/\/romelcoinc.com\/wp-content\/uploads\/2017\/07\/20479430_1864221263896118_8580434875261918543_n-168x300.jpg 168w, https:\/\/romelcoinc.com\/wp-content\/uploads\/2017\/07\/20479430_1864221263896118_8580434875261918543_n-300x534.jpg 300w\" sizes=\"auto, (max-width: 539px) 100vw, 539px\" \/><\/p>\n<p><span style=\"color: #000000;\">\u00a0<\/span><\/p>\n<p>&nbsp;<\/p>\n<p><span style=\"color: #000000;\"><strong>ANG TAGAPAMAHALA<\/strong><\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>July 31, 2017 &nbsp; Sa aming mga minamahal na Miyembro Konsumedores: &nbsp; PAKSA: The Sitio Electrification Program (SEP) of\u00a0ROMELCO\u00a0is grinding once again &nbsp; &nbsp; The Sitio Electrification Program (SEP) of ROMELCO is grinding once again. Top in the coop&#8217;s list is the Sitio Balao in Barangay Lonos Romblon that happened to be delayed from its <a class=\"moretag\" href=\"https:\/\/romelcoinc.com\/index.php\/blog-post\/the-sep-of-romelco-is-grinding-once-again\/\">Read More &#8230;<\/a><\/p>\n","protected":false},"author":1,"featured_media":1447,"comment_status":"closed","ping_status":"closed","template":"","tags":[],"blog-category":[],"class_list":["post-1444","blog_post","type-blog_post","status-publish","has-post-thumbnail","hentry"],"_links":{"self":[{"href":"https:\/\/romelcoinc.com\/index.php\/wp-json\/wp\/v2\/blog_post\/1444","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/romelcoinc.com\/index.php\/wp-json\/wp\/v2\/blog_post"}],"about":[{"href":"https:\/\/romelcoinc.com\/index.php\/wp-json\/wp\/v2\/types\/blog_post"}],"author":[{"embeddable":true,"href":"https:\/\/romelcoinc.com\/index.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/romelcoinc.com\/index.php\/wp-json\/wp\/v2\/comments?post=1444"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/romelcoinc.com\/index.php\/wp-json\/wp\/v2\/media\/1447"}],"wp:attachment":[{"href":"https:\/\/romelcoinc.com\/index.php\/wp-json\/wp\/v2\/media?parent=1444"}],"wp:term":[{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/romelcoinc.com\/index.php\/wp-json\/wp\/v2\/tags?post=1444"},{"taxonomy":"blog-category","embeddable":true,"href":"https:\/\/romelcoinc.com\/index.php\/wp-json\/wp\/v2\/blog-category?post=1444"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}