January 21, 2017
Sa aming mga minamahal na Miyembro Konsumedores:
PAKSA: ROMELCO upgrades systems distribution lines and readies the coops power lines for the future demands
The power interruption in the municipality of Romblon that was scheduled last January 18 to 19 2017 that lasted for almost four hours in every areas was due to ROMELCO’s line maintenance. The technical department headed by Engr. Basilio Diaz Jr installed three reclosers to every feeders to upgrade the systems distribution lines and ready the coops power lines for the future demands.
ANG TAGAPAMAHALA